|
|
TM 32-5811-024-14&P
CHAPTER 2
SERVICE UPON RECEIPT AND INSTALLATION
Section I. SERVICE UPON RECEIPT OF MATERIAL
2-1. Unpacking.
When packed for shipment, the digital processor test set is wrapped with plastic and placed in a cardboard
container. Fiberboard blocking material is provided to minimize shock during transport. The procedure for unpacking the
unit is obvious upon inspection.
2-2. Checking Unpacked Equipment.
a. Inspect the equipment for damage incurred during shipment. If the equipment has been damaged, report the
damage on DD Form 6 (Report of Packing and Handling Deficiencies) as prescribed in AR 700-58.
b. Check the equipment against the component listing in the packing slip to see if the shipment is complete. The
equipment should be placed in service even though a minor assembly or part that does not affect proper functioning is
missing.
c. Check to see whether the equipment has been modified. (Equipment that has been modified will have the MWO
number on the front panel, near the nomenclature plate.) Check also to see whether all currently applicable MWOs have
been applied. (Current MWOs applicable to the equipment are listed in DA Pam 310-4.)
d. For dimensions, weights, and volume of packaged items, see SB 700-20.
Section II. INSTALLATION INSTRUCTIONS
2-3. Tools, Test Equipment, and Materials Required for Installation.
No tools, test equipment, or materials are required for installation of the digital processor test set.
2-4. Installation Instructions.
The digital processor test set is a portable unit requiring no special installation. To operate, connect the unit to 3-o,
115-V ac, 400-Hz and +28-V dc primary power.
2-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |