|
|
TM 32-5410-221-14&P
a. Removal.
b. Installation.
(1) Set all circuit breakers and equipment
(1) Install one ground terminal (3), one
power switches to OFF. See figure 5-1. Provide other
lockwasher (4), two flat washers (2), and two nuts (1) on
lighting as required.
bolt (7).
(2) Unplug main power cable from shelter
(2) Install bolt (7) in shelter wall.
receptacle.
(3) Install one nut (1), one lockwasher (4),
(3) Remove one wing nut (5), two flat
one ground terminal (3), two flat washers (2). and one
washers (2), one ground terminal (3), one lockwasher
wing nut (5) on bolt (7) on exterior shelter wall.
(4), and one nut (1) from bolt (7) on exterior shelter wall.
(4) Using Multimeter AN/USM-223, test
(4) Remove bolt (7) from shelter wall.
ground lug assembly for negligible resistance.
(5) Remove two nuts (I), two flat washers (2),
(5) Plug main power cable into shelter
one lockwasher (4), and one ground terminal (3) from
receptacle.
bolt (7).
(6) Set circuit breakers and equipment power
switches to ON.
5-11/(5-12 blank)
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |