TM 32-5410-221-14&P
(7) Connect ground strap to ground rod and
shelter ground lug.
(1) Set all circuit breakers and equipment
power switches to OFF.
(8) Saturate the area around the ground rod
with water to keep grounding site moist.
(2) Unwind power cable from power cable
reel.
NOTE
(3) Connect power cable to power source.
If a generator is used for ac power,
(4) Plug power cable into shelter power
ground it the same as the shelter.
receptacle.
b. Preliminary Checks and Services. Perform the
d. Telephone Set TA-312/PT. When a telephone
following checks and services before making power
set is supplied, proceed as follows:
connections:
(1) Install telephone set in bracket.
(1) Using Multimeter AN/USM-223, test
(2) Attach signal leads to the telephone set
ground rod assembly(s) for negligible resistance.
and the telephone receptacle internal binding post.
(2) Set all circuit breakers and equipment
(3) Attach signal leads to the telephone
power switches to OFF.
receptacle, external binding post, and communications
device.
e. Preventive Maintenance Checks and Services
the S-281/G may be supplied by a 5-kW generator, a
central power source, or commercial power. The power
must be 115/220 Vac, 50/60 Hz, 3-phase. Connect
power as follows:
Section V. PRELIMINARY ADJUSTMENT OF EQUIPMENT
equipment, cabling, and connections. See 2-11 and 2-
2-13
EXTENT OF PRELIMINARY CHECKS AND
12.
ADJUSTMENTS. Preliminary checks and adjustments
of the S-281/G are limited to the release of stowed
Section VI. INSTALLATION AND CIRCUIT LINEUP
Not applicable.
2-6
|