Click here to make tpub.com your Home Page

Page Title: TRUCK TRANSPORT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 32-5410-221-14&P
Release stowed equipment as follows:
CAUTION
Make certain that the sling hooks
a. Boarding Ladder Assembly M-7567/G.
point away from the shelter.
(1) Remove ladder by loosening tiedown
(b) Attach a sling assembly to each tiedown
clamp assembly at top ladder support.
eye and eye bolt assembly.
(2) For truck installation, place tailgate in
(c) Tighten all turnbuckles evenly by hand;
horizontal position; hook ladder top firmly over tailgate
then turn each turnbuckle an additional one-half turn
rear edge; and rest ladder bottom on ground.
with a bar or rod inserted in the turnbuckle slot.
(3) For ground installation, stow the ladder in
(d) Insert appropriate-sized wooden blocks
an authorized storage area.
between shelter skids and truck bed sides to prevent
b. Air Filter Cover. Open air filter cover on inside
sideways movement strain on the sling assembly
door top.
cables.
c. Ventilation Ports.  Open ventilation ports on
(e) Insert appropriate-sized wooden blocks
shelter front.
between the shelter skids and the cab wall of the truck
d. Power Cable Reel Assembly.
bed to protect the towing eyes of the shelter and the cab
(1) Release reel assembly from floor tiedown
wall of the truck bed.
plate by loosening hold-down bracket.
(2) Remove reel assembly from shelter.
2-9
TRUCK  TRANSPORT.
e. Air Conditioner.
Prepare and transport the S-281/G as follows:
a. Perform steps 2-8, a through o.
(1) Roll up air conditioner external canvas
cover. Secure with tiedown snap located on canvas.
b. Raise and secure truck tailgate.
(2) Release air conditioner power cable from
c. Transport shelter to site.
tiedown.
d. Detach tiedown brackets from each truck-bed
siderail corner, and/or detach sling assemblies from
2-12
CABLING AND CONNECTIONS.
each tiedown eye and the tiedown rings.
e. Perform steps 2-8, a through i.
WARNING
f. Move truck clear of shelter.
g. Lower  and  position  shelter  on  prepared
The  shelter  must  be  properly
installation site.
grounded  before  main  power  is
h. Detach sling assemblies from lifting hook and
connected.
from each shelter lifting eye.
i. Detach ropes from shelter towing eyes.
a. Grounding.
j. Secure ropes and sling assembly.
NOTE
2-10
HELICOPTER TRANSPORT. See figure 2-2.
The grounding site must be within 6
Prepare and transport the S-281/G as follows:
feet  of  the  shelter  ground  lug.
Grounding should not interfere with
the entrance door, field wiring, or
a.
Perform steps 2-8, a through d.
power cables.  The site should be
b.
Lift and transport shelter.
low and damp if possible.
c.
Lower and position shelter on installation site.
d.
Perform steps 2-9, h through j.
(1) Select grounding site.
(2) Remove ground rod from tiedown bracket.
2-11
RELEASE OF STOWED EQUIPMENT.
See
(3) Remove grease or other non-conductive
figures 1-1 and 2-1.
soil from ground rod.
(4) Scoop out hole at grounding site (about 6
WARNING
inches in diameter and 6 inches deep).
(5) Drive ground rod into ground at center of
VENTILATION  IS  ESSENTIAL  to
hole until ground rod is firmly set (2 to 3 feet).
PREVENT ASPHYXIATION when the
shelter is occupied.
(6) Remove  ground  strap  from  tiedown
bracket.
2-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business