4-28 CONTROL PANEL ASSEMBLY
This task covers removal and installation of panel cover and replacement of:
b. Toggle Switches (FOG OIL, FUEL,
INITIAL SETUP
Equipment Condition
Tools
Control panel removed from vehicle (P. 4-20).
General Mechanic's Automotive Tool Kit
SC 5180-90-CL-N26
Materials
Soldering gun (shop equip-common No. 1)
Solder (Item 12A, App E)
Screwdriver A116-3
Tie down straps (Item 13, App E)
Sealing compound (Item 11A, App E)
Insulation sleeving (Item 7C, App E)
Panel Cover
REMOVAL
1. Remove ten screws (l), 20 washers (2), and ten nuts (3).
2. Remove panel cover (4) from instrument panel (5).
INSTALLATION
Position panel cover (4) on instrument panel (5) and secure with ten screws (1), 20 washers (2) and
ten nuts (3).
Change 3
|