|
|
![]() TM 3-1040-279-12&P
4-16 EQUIPMENT CONTAINER ASSEMBLY (CONT).
i. Fog Oil Pressure Hose Assembly.
REMOVAL
1. Loosen two screws (1) securing sides of cover assembly (2). Remove two screws (3), lockwashers
(4), and washers (5) securing top of cover assembly and open cover assembly.
2. Remove eight screws (6) and washers (7) securing equipment container panel (8).
3. Disconnect fog oil hose assembly (9) from pressure switch bracket (10).
4. Disconnect fog oil hose assembly (9) from bulkhead tee (11) on equipment container (12).
5. Remove fog oil hose assembly (9) from equipment container (12).
INSTALLATION
1. Install fog oil hose assembly (9) in equipment container (12).
2. Connect fog oil hose assembly (9) to pressure switch bracket (10).
3. Secure fog oil hose assembly (9) bulkhead tee (11) on equipment container (12).
4. Position equipment container panel (8) and secure with eight screws (6) and washers (7).
5. Slowly close cover assembly (2). Position hoses in equipment container while closing cover so that
hoses do not become kinked or pinched. Secure cover assembly with screws (1 and 3), lockwashers
(4), and washers (5).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |