|
|
TM 3-1040-279-12&P
INSTALLATION
NOTE
Apply sealing compound (Item 12, App E) to threads of male pipe fittings
before installing.
The following procedure is performed to determine which is the inlet/outlet
port. The solenoid is in the non-energized mode.
Blow air into one of the side ports to determine if this is the fuel supply port. It is the fuel supply port
1.
if air blows out the END port. Install tee (21) of solenoid valve to this port.
2.
Install elbow (29) with elbows (30) as one assembly to other side port.
3.
Install fuel filter (26) on elbows (30).
4.
Install solenoid valve (22) on cover assembly (12) with two screws (27) and washers (28).
5.
Connect fuel hose assembly (1) to fuel filter (26).
6.
Install elbow assembly (25) to END port of solenoid valve (22).
7.
Connect pump pressure tube assembly (23) between fuel test adapter (24) and tee (21).
8.
Connect solenoid inlet tube assembly (19) between elbow (20) and tee (21).
9.
Connect fuel return tube assembly (18) to cross (15).
10. Connect fuel pressure hose assembly (16) to elbow (17).
11. Connect pump return tube assembly (13) between elbow (14) and cross (15).
12. Install motor cover (11) on cover assembly (12) with two screws (9) and washers (10).
13. Feed wire leads of solenoid valve through equipment container (3) and connect leads to terminal
screw threads with sealing compound (Item 11 A, App E) before securing wire leads.
14. Install equipment container panel (6) with eight screws (4), and washers (5).
15. Reassemble cover assembly (P. 4-37).
4-40
Change 4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |