|
|
TM 3-1040-276-23
ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES SCHEDULE (CONT)
S - SEMIANNUALLY
M - MONTHLY
Item
Interval
Item
To Be
Procedures
Inspected
No.
M
S
2
Air pump
d. Lubricate sleeve nut (7), inside of air pump tube (4), and felt washer (6)
with lubricating oil (item 6, app C).
assembly
(cont)
e. Press air release button (9) to release pressure from accumulator
assembly before inserting air pump piston (10).
f. Insert air pump piston (10) end into air pump tube (4) and press pump
rod bushing (11) into tube while alining two holes in bushing with two
holes in tube. Insert two cotter pins (1) through two holes in air pump
tube and pump rod bushing. Bend ends of cotter pins.
g. Perform operator's PMCS on air pump assembly (TM 3-1040-276-10)
and troubleshoot if necessary (p 2-67).
h. Insert lock pin (2) into air pump handle (3).
2-4
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |