Click here to make tpub.com your Home Page

Page Title: Video Enable Delay and Period Test-CONT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

I
Control settings
Performance standard
Test procedure
Equipment under test
Step
Test equipment
2
b. Note that start of video enable
b. None.
(Cont)
period pulse on B INPUT is coincident
with the trailing edge of the video
enable delay pulse on A INPUT.
MAIN
c. None.
c. Set
TIME/DIV to 10 SEC.
Observe the complete video
enable period pulse.
d. Disconnect A INPUT from
d.None.
A 1 0 T P 6 and connect to
AN/TPM-25A REPLY VID
OUT.
e. Observe position of trailing edge
e. The video enable period will
of last reply pulse on A INPUT
after
conclude within 6
with respect to trailing edge of
the trail-edge of the last
video enable period pulse on B
reply pulse.
INPUT.
f. None.
f. S e t t e s t  s e t FUNCTION
switch IP and MODE switch
to 1.
g. Same as e above.
g. Set AN/TPM-25A REPLIES
FUNCTION SEL switch to I/P
Ml. Repeat procedure in e above.
h. Set test set MODE switch to 2.
h. None.
i. Set AN/TPM-25A REPLIES
i. Same as e above.
MODULATION SEL switch to
I/P M2/3. Repeat procedures in e
above.
j. S e t  t e s t  s e t FUNCTION
j. None.
switch to EMER.
k. Set AN/TPM-25A REPLIES
k. None.
MODULATION SEL switch to
EMERG.
l. S e t
MAIN
l. Same as e above.
TIME/DIV to 10 SEC and
repeat procedure in e. above.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business