Click here to make tpub.com your Home Page

Page Title: Transmitter Power Test
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

5.2-4. Transmitter Power Test
a. Test Equipment Required
b. Test Connections and Conditions.
(1) Connect the equipment as indicated in c below.
(2) Connect test point A4TP5 to ground (module A4 at the rear of test set.
c. Procedure.
Control settings
Equipment under test
I Performance standard
Test procedure
Test equipment
Step
INone.
MODE: 1.
None
N/A
1
Code Any.
FUNCTION: SYSTEM
POWER ON.
ISLS: OFF
CAUTION
The test equipment settings
Controls remain as in step 1.
TS 779A/U
2
must be performed before the
BOLO BIAS CURRENT OFF.
MX-2144A/U, is connected to
BOLO
avoid equipment damage.
RES:200.
a Connect the MX-2144A/U to the  a. None.
B O L O TEMP COEF: NEG.
TS 779A/U.
RANGE:
b. None.
b. Adjust the TS 779A/U as
0 DBM.
follows: (1) Set the BOLO BIAS
CURRENT switch to 10-16 MA.  I
(2) Set the LINE POWER
switch to ON, and permit a
15-minute warmup. -
(3) Adjust the ZER0 SET
COARSE AND FINE
controls to zero meter.
c. Connect the equipment as shown  c. None.
in figure 5-2. Make sure that test
point A4TP5 is grounded.
d. Connect the MX-2144A/U to  d. -61 dbm.
the test set PROBE jack. Ob
serve the power indication.
e. Disconnect the ground from  e. None.
test point A4TP5, and connect
test point A4TP4 to ground.
Disconnect the MX-2144A/U.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business