Control settings
Equipment under test
Test equipment
Normal indication
Step
Procedure
PUSH TO TEST: Continually press and a. set AN/APM-270(V) CONSECU- a. ACCEPT indicator glows.
6
TIVE REPLIES switch at 56 and
release to observe specified conditions.
note transponder test set indica-
tion.
b. Repeat a above, but set to 55 and then b. REJECT indicator glows.
54. Note whether normal indication
is provided for both settings of
switch.
7
AN/AMPM-270(V)
a, ACCEPT indicator glows.
CONSECUTIVE REPLIES: 16
a. Note transponder test set indication
a. DIR-RAD: DIR
b. Set AN/UPM-270(V) CONSECU- b. REJECT indicator glows.
b. PUSH TO TEST: Contiu-
TIVE REPLIES switch to 15 and
ually press and release to ob-
then 14. Note whether normal indi-
serve specific conditions.
cation is provided in each position.
c. Reset AN/APM-270(V) CONSECU- c. None.
TIVE REPLIES switch to 16.
d. Set AN/APM-270(V) REPLY MODU- d. REJECT indicator glows.
LATION 1X-2X switch at 2X. Note
transponder test set indication.
e. Sectionalization Tests Using AN/UPM-137A.
Control Settings
Step
Test equipment
Normal indicatwn
Equipment under test
Procedure
1
AN/UPM-137A
a. Apply power to equipment and per-
a. None.
FUNCTION SYSTEM
MODE 4
mit 5 minutes warmup.
HORIZONTAL-SYNC:
DIR-RAD: RAD
b. +5 0.1 volt.
b. Connect multimeter dc probe to
EXT DC
A3TP1 (fig. 5.1-1). Observe volt-
HORIZONTAL-TIME/DIV:
ISLS: OFF
age indication.
10 sec
DISPLAY-CHAN A/ALT/
CHAN B: CHAN A
VERTICAL-CHAN A-75
IN/OUT: OUT
VERTICAL-CHAN A-AC/DC
DC
VERTICAL-CHAN A-VOLT/
DIV: 1
AN/APM-270(V)
a. None.
Same as step 1 . . . . . . . . . . . . . . . . . .
2
CONSECUTIVE REPLIES: 64
REPLY MODULATION-
set,
AN/APM-270(V),
and
SPACING-PULSE 2:0
AN/UPM-137A and permit 15-
REPLY MODULATION-
minute warmup.
b. Press test set PUSH TO TEST switch
b. Test set should indicate AC-
SPACING-PULSE 3:0
SYNC-GAIN: Midposition
and turn to LOCK position.
CEPT.
SYNC-DELAY Midposition
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |