Click here to make tpub.com your Home Page

Page Title: Reply Evaluation Percentage Tests
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

5-9. Reply Evaluation Percentage Tests
a. Test Equipment Required
(1) Test Set, Radar AN/UPM-98.
(2)  Generator, Signal AN/URM-64A.
(3) Modulator MD-796.
(4) Multimeter ME-26B/U.
b. Test Connections and Conditions. Connect the equipment as shown in figure 5-7.
c. Procedure.
Performance
Test
Standard
procedure
a. Turn on the AN/URM/64A. Permit this
a. None.
equipment to warm up 1 hours.
b. None.
b. Turn on the AN/UPM-96 and permit a
few minutes warmup.
c. None.
c. Adjust and connect the AN/URM-64A as
follows:
(1) Adjust the ZERO SET control to
zero the meter.
(2) Set the FUNCTION switch to
C W , and adjust the POWER
SET control for 0-dbm meter
indication.
(3) Adjust the SIGNAL FRE-
QUENCY control to 1,090 mc.
a. Turn on the oscilloscope and test set. a. N o n e
Permit a few minutes warmup.
b. Press the test set PRESS-TO-TEST b. N o n e .
switch, and turn to LOCK.
c. Adjust the TRIGGER DELAY COARSE  c. None.
AND FINE controls until a solid test
set ACCEPT indication is just obtained.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business