5-9. Reply Evaluation Percentage Tests
a. Test Equipment Required
(1) Test Set, Radar AN/UPM-98.
(2) Generator, Signal AN/URM-64A.
(3) Modulator MD-796.
(4) Multimeter ME-26B/U.
(5) Oscilloscope,
c. Procedure.
Performance
Test
Standard
procedure
a. Turn on the AN/URM/64A. Permit this
a. None.
equipment to warm up 1 hours.
b. None.
b. Turn on the AN/UPM-96 and permit a
few minutes warmup.
c. None.
c. Adjust and connect the AN/URM-64A as
follows:
(1) Adjust the ZERO SET control to
zero the meter.
(2) Set the FUNCTION switch to
C W , and adjust the POWER
SET control for 0-dbm meter
indication.
(3) Adjust the SIGNAL FRE-
QUENCY control to 1,090 mc.
Permit a few minutes warmup.
b. Press the test set PRESS-TO-TEST b. N o n e .
switch, and turn to LOCK.
c. Adjust the TRIGGER DELAY COARSE c. None.
AND FINE controls until a solid test
set ACCEPT indication is just obtained.
|