Click here to make tpub.com your Home Page

Page Title: Replacement of Parts
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-542-14-1
(5)  A carelessly soldered connection may
(2) Disconnect radio frequency cables from
create new faults. It is important to make well-soldered
front panel.
joints because a poorly soldered joint is one of the most
(3) Remove side covers from AN/USM-108A
difficult faults to find.
by turning two locking screws on each side of chassis,
(6) Replace parts in the circuit in exactly the
disengaging the covers at the bottom of the chassis and
same position occupied by the original part. A part that
removing covers.
has the same electrical value but different physical size
(4) Remove six screws from front panel; one
may cause trouble. Give particular attention to proper
in each corner and two securing the nameplate to the
grounding when replacing a part; use the same ground
front panel.
as in the original wiring.  Failure to observe these
(5) Remove grounding lug from front panel
precautions may result in decreased output or parasitic
by removing screw at rear of lug.
oscillations.
(6) Unscrew lenses from indicator lamps on
(7)  Do not disturb any of the alignment
front of panel; note color.
adjustments unless it definitely has been determined that
(7) Remove retaining nut from POWER ON
the trouble is caused by an adjustment.
switch.
(8)  Remove retaining nuts from rear of
indicator lamps.
6-9. Replacement of Parts
(9) Remove front panel and trim strip.
a.
The components of AN/USM-108A are easily
b.
Assembly.
reached and replaced if found faulty. The transformer,
(1) Position front panel and trim strip onto
reactors, and terminal boards are mounted securely to
chassis.
the chassis with hexagonal nuts and machine screws.
(2)  Position indicator lamps through front
b.
If any of the switches require replacement,
panel and secure in place with retaining nuts.
carefully mark the wires connected to the switch with
(3) Position POWER ON switch through front
tags to avoid misconnection when the new switch is
panel and secure in place with retaining nut.
installed.  Follow this practice whenever replacement
(4)  Screw proper-colored indicator lenses
requires the disconnection of numerous wires.
onto indicator lamps.
c.
For tube replacement techniques, refer to
(5) Install grounding lug in front panel and
secure with nut on rear of panel.
d.
Refer to figure 6-5  (1) through (11) for
(6)  Position nameplate on front panel and
location of parts.
secure in place with two screws.
6-10.
Disassembly and Assembly of Front
(7)  Install four screws in corners of front
Panel
panel.
a.
Disassembly. Disassembly of the front panel
(8) Install side covers in position at bottom of
is necessary if any of the front panel switches are
chassis and secure in place with two locking screws on
repaired or replaced.  Follow the procedure outlined
each side cover.
below:
(9) Connect cables as required.
(1) Disconnect power cable from source and
from AN/USM-108A.
6-11

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business