FOURTH ECHELON TESTING PROCEDURES AND FINAL TESTING
Section I. FOURTH ECHELON TESTING PROCEDURES
Comply with the instructions preceding the
29. General
body of each chart before proceeding to the
a. Testing procedures are prepared for use
chart. Perform each test in sequence. Do not
by Signal Field Maintenance Shops and Signal
vary the sequence. For each step, perform all
Service Organizations responsible for fourth
the actions required in the Test equipment,
echelon maintenance of signal equipment to
control settings and Equipment under test,
determine the acceptability of repaired equip-
control settings columns; then perform each
ment. These procedures set forth specific re-
specific test procedure and verify it against
q u i r e m e n t s that repaired signal equipment
its performance standard.
must meet before it is returned to the using
organization. The testing procedures may also
30. Test Equipment and Materials Required
be used as a guide for testing equipment re-
All test equipment, materials, and other
paired at third echelon if the proper tools and
equipment required to perform the testing
test equipment are available. A summary of
procedures given in this section are listed in
the performance standard is given in para-
the following chart and are authorized under
graph 38.
TA 11-17 and TA 11-100(11-17), or are repair
b. Each test depends on the preceding one
part items of the subject equipment authorized
for certain operating procedures and, where
applicable, for test equipment calibrations.
for stockage at fourth echelon level.
Multimeter TS-352(*)/Uab
6626-242-5023
TM 11-5527
Voltmeter, Meter ME30A/U or Voltmeters, Elec-
6625-669-0742
TM 11-5132
tronic ME-30B/U or ME-30C/U
Light Assembly, Electric MX-1292/PAQ
6695-537-4470
TM 11-5540
Tube Socket Adapter MX-1258/U
5935-378-5009
NAVSHIPS
91798
Transformer, Variable CN-16/U
None
5950-235-2086
Resistor, 10,000 ohms
5905-199-1600
None
* Indicates model TS-352/U. TS-352A/U, or TS-352B/U.
b
Multimeter AN/URM-105 may be used in place of Multimeter TS-352 (*)/U.
31. Test Facilities
32. Modification Work Orders
No special test facilities are required to per-
The performance standards listed in the
form the tests given in this procedure. All
tests (para 34 through 37) assume that the
tests should be performed using 115- to 120-
modification work order listed below has been
volt, 60-cycle, ac power. All connecting cords
performed. A listing of current modification
are a part of the test equipment or the equip-
work orders will be found in DA Pamphlet
ment under test unless otherwise indicated on
310-4.
the applicable illustration.
MWO 6626-274-36/1
24 Jun 59
N
3
Adjacent to nameplate
All sets