Click here to make tpub.com your Home Page

Page Title: CHAPTER 4 SHIPMENT, LIMITED STORAGE, AND DEMOLITION OF MATERIAL
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

SHIPMENT, LIMITED STORAGE, AND DEMOLITION
OF MATERIEL
Section I. SHIPMENT AND LIMITED STORAGE
4-1. Disassembly of Equipment
plastic, if available, and place in cover compart-
(figs. 1-1 and 1-2)
ments as shown in figure 1-2.
e. Snap the small adapters into their clips as
shown in figure 12.
Prepare the maintenance accessories kit for ship
ment or storage as follows:
f. Insert the technical manual into the com-
a. Disconnect all cables from the maintenance
partment provided.
g. Set the breakout boxes into their respective
accessories kit connectors.
brackets (fig. 1-1).
b. Check to see that all retaining screws on the
h. Close the case and secure the latches.
breakout boxes and the termination box are
Secure.
4-2. Packaging for Shipment
c. Coil each cable assembly carefully and
place the cables and the termination box (fig.
Wrap the maintenance accesories kit in water.
1-2) into the cover of the maintenance accesso-
proof paper and place the package in a corru-
ries kit carrying case. Sucure the cables with the
gated carton. Use reinforced gummed tape for
retaining straps.
sealing the corrugated cartons. If limited storage
is expected, place the carton within an outer car-
d. Group the extender cards into sets as listed
in b, c, and d of paragraph 1-6, wrap in clear
ton and seal.
Section Il. DEMOLITION OF MATERIEL TO PREVENT ENEMY USE
(1)
Breakout
boxes.
4-3. Authority for Demolition
(2)
Extender
cards.
This equipment, in relation to other equipments
(3)
Extender
cables and termination box.
on-site, will have a low order of priority for dem-
(4)
Technical
manuals.
olition. However, demolition of the equipment
b. Use any of the following methods:
will be accomplished upon the order of the com-
mander. The destruction procedures outlined in
(1) Smash. Smash a l l c o m p o n e n t s . U s e
paragraph 4-4 will be used to prevent further
sledges, axes, hand axes, pickaxes, hammers, or
use of the equipment.
crowbars.
(2) Cut. Cut cables and circuit wiring.
4-4. Methods of Destruction
(3) Burn. Burn the technical manuals, use
gasoline, kerosene, or oil.
a. If a complete destruction of the equipment
cannot be accomplished in the time available, de-
(4) Dispose. Bury or scatter the destroyed
stroy the following components in the order
parts in slit trenches, foxholes, or throw them
into streams.
given:

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business