|
|
TM 11-5995-208-24&P-1
INSULATION BREAKDOWN/LEAKAGE (CONT)
Twenty-five hundred volts dc exist at the AN/GSM-6 and test cable stub test leads during
testing. Don't take chances. Be careful. Death or serious injury may result if you are not
careful.
CAUTION
If DC OVERLOAD indicator on the AN/GSM-6 lights up, stop test because you have a bad
cable.
Whenever you stop the test, YOU must always do a complete Stopping Procedure as
outlined in TM 11-6625-273-12.
NOTE
During the 1 minute you are applying 2500 vdc, which should yield a 2.5 kilovolt reading
(1), observe the MICROAMPERES (2) meter. If leakage current reaches 50
microampere (3), you have a bad cable. Stop test.
If second coaxial cable passes test voltage for 1 minute, stop applying voltage and do a
complete Stopping Procedure.
11. Perform Withstand Test outlined in TM 11-6625-273-12.
12. Apply 2500 vdc for 1 minute.
3-37
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |