Click here to make tpub.com your Home Page

Page Title: CHAPTER 1 INTRODUCTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM11-5895-932-14&P
CHAPTER 1
INTRODUCTION
Section 1. GENERAL
1-1. Scope
Equipment. Use equipment forms and records in
accordance with instructions in TM 38-750.
a. This manual describes the Patch and Test
b. Station Operation  and Maintenance. Use
Facility at Letterkenny Army Depot, Cham-
forms and records in accordance with instructions
bersburg, Pennsylvania and provides instructions
in the station Standard Operating Procedures
for operating and maintaining the facility
(SOP).
equipment. A repair parts list (app B) is also
c. Plant-In-Place Records. Changes, corrections
included.
and updating of Plant-In-Place Records (para 3-3)
b. Throughout this manual references are made
should be reported to US Army Communications
to other publications that cover equipment in the
Electronics Engineering Installation Agency (CED-
facility.   A c o m p l e t e l i s t i n g o f a p p l i c a b l e
FER), Fort Huachuca, Arizona 85613.
publications is provided in appendix A.
1-4. Administrative Storage
1-2. Indexes of Equipment Publications
The procedures for administrative storage are
a. DA Pam 310-4. R&r to the latest issue of
outlined in TM 740-90-1; however, the exact
DA Pam 310-4 to determine whether there are new
procedure in repacking for limited storage depends
editions, changes,  or additional publications
on the materials available and the conditions under
pertaining to the equipment.
which the equipment is to be stored.
b. DA Pam 310-7. Refer to DA Pam 310-7 to
1-5. Destruction of Army Materiel
determine whether there are modification work
orders (MWOs) pertaining to the equipment.
Refer to TM 750-244-2 for demolition procedures
1-3. Forms and Records
for electronic equipment.
a. Reports of Maintenance and Unsatisfactory
Section II. DESCRIPTION AND DATA
1-6. Purpose and Use
12 trans. 12 Rec
DC High level
The patch and test facility (PTF) installed at this
DC Low level
12 trans. 12 Rec
48 (3 bays)
Multichannel Jack appear-
station provides a centralized point, which is part
ances
of  the  Automated Telecommunication Center
COMSEC Facilities
rmy Depot in Cham-
KG- 13 (2 operation, 2 spare)
AC Power
the interconnection of
KG-34
120/208.3 phase 60 Hz
Red and black
Additionally, the PTF
(supplied from three sep-
provides access to all
arate power distribution
incoming and  outgoing communication lines,
panels)
transmission security, and line, and component
Uses
DC Power Supplies
Alarm panel signaling.
48 Vdc
1-7. Tabulated Data
H/L- L/L operation and
testing purposes
Modulated light sources and
Red/Black Isolation
photosensitive  receivers
(appA)
Alarms
Conditions
of installed
(Audible alarm and alarm
panel light)
Circuits (FDX)
Number
Isolator
Loss of power, door open, high
2ea
Autodin
temp(l30)
Remote terminals
18 ea (expandable to 24)
1-8. Description of Patch and Test
Facility,
12ea
Patching Facilities
General
Number
2/wire jack
appearances
The Patch and Test Facility (PTF) is part of the
VF
48
1-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business