|
|
TM 11-5895-878-14&P
scheduled basis.
These tests are located in the
3-20. Testing Procedures
manufacturers' technical manuals.
a. Quality Assurance tests should be made in
c. Failing Circuits. If circuits fail to meet the
accordance with the latest DCA QA testing schedule.
required, specifications during a test, the deficiency
b. Patch the circuit to be tested to the QA test
should be located and corrected as soon as traffic
center via the Interbay trunking system (para 2-16).
conditions warrant interruption of the circuit for the
c. Perform testing as given in DCA circulars listed
required period
in appendix A.
3-15
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |