Click here to make tpub.com your Home Page

Page Title: SECTION I ORGANIZATIONAL AND INTERMEDIATE MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

T.O. 31S5-4-308-1
TM 11-5805-663-14-13
NAVELEX 0967-464-0010
ORGANIZATIONAL AND INTERMEDIATE MAINTENANCE
substitution of suitable test equipment,
6-7. GENERAL.
when the listed test equipment is not avail-
able, the test paramenters (characteristics)
6-8. The organizational and intermediate
and required accuracies for the test outlined
maintenance procedures described are di-
in this chapter are also given.
vided according to the Processor and Core
Memory acceptance test tapes (GINS I, II,
III, IV Test, Interrupt Test, Worst Pattern
PERFORMANCE TEST STA
Memory Test, etc.). The procedures are
provided in the form of test tables that con-
6-12.  The performance test standards com-
tain performance standards (TTY print outs
prise tests relating to the Processor and
or visual indications) which indicate that
Core Memory functions. These tests con-
a function is operating normally under the
tain performance standards which, if unob-
conditions specified.
tainable, isolate malfunctions to one or
more replaceable PC cards. The tests are
MAINTENANCE SUPPORT EQUIPMENT.
accomplished by use of an Acceptance Test
Program (ATP) test tape. The test tape is
6-10. Table 6-l lists the test equipment
comprised of 12 functional tests and a
required to perform maintenance on the Pro-
utility program listed below:
cessor and Core Memory. To permit
Function
ATP Test
Basic operating system (BOS) program; a collection of
BOS
Programmer/Operator-oriented utility routines, and
a command processing monitor.
Performance test for CPA, CPU, and Bus Controller,
Part I.
Performance test for CPA, CPB, and Bus Controller,
Part II.
Performance test for CPA, CPB, and Bus Controller,
Part III.
Performance test for CPA, CPB, and Bus Controller,
Part IV.
Performance test for CPA, CPB, and Bus Controller
Interrupt.
Performance test for Core Memory and Core Memory
Controller, Part I.
Performance test for Core Memory and Core Memory
Controller, Part II.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business