|
|
T.O. 31S5-4-308-1
TM 11-5805-663-14-13
NAVELEX 0967-464-0010
PREPARATION FOR USE AND RESHIPMENT
describes tune-up and testing and in addi-
INTRODUCTION.
tion any adjustments that are required prior
to equipment use. Section II describes
preparation for reshipment, methods, dis-
assembly/reassembly procedures and any
applicable to preparation for use of the
special requirements to assist in reshipment.
Processor and Core Memory. Section I
PREPARATION FOR USE
Operation and Maintenance Manual. The
units can be checked for proper operation
factory-adjusted for optimum performance
by performing the test tabulated in Chap-
and generally do not require readjustment
ter 6. If readjustments are required to
at the time of installation. Before the
bring the units up to acceptable opera-
Processor can be used it must be loaded
ting standards, refer to Chapter 6
with program and data base information as
for adjustment procedures.
described in the applicable group
PREPARATION FOR RESHIPMENT
USE OF DEHYDRATING AGENT.
SPECIAL INSTRUCTIONS.
3-7. A dessicant agent (dehydrating
agent per MIL-D-9394) should be used
3-5. To prepare the equipment for re-
in the equipment crates and boxes (in
lieu of water vaporproof barriers) when
shipment, disable it by following, in
they are prepared for reshipment or
essential the reverse order, the in-
storage. In general, 1/2-pound of
stallation procedures provided in the
dessicant should be used for every
applicable group Operation and Main-
three cubic feet of crate or box.
tenance Manual.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |