|
|
TM 10-7360-204-13&P
NOTE
After repacking, inspect for leaks between packing nut and valve stem.
Tighten packing nut as required. Apply anti-seize compound to threads of
preheater valve.
Figure 4-2. Packing the Preheater Valve.
4-9.5 AIR PRESSURE GAGE.
b. Removal. Remove the air pressure gage by turning counterclockwise.
4-14
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |