l. Stop off the pump, disconnect the tapwater
t. Stop the pump and turn off the rectifier.
connections and connect as instructed in steps g and h
Disconnect the pressure and return line from reservoir
No.  3.  Disconnect the pump.  Disconnect the filter
except connect the pump to reservoir #1 (EDTA).
m. Start on the pump and allow to run for 60
housing.
u. Flush the heat exchanger with clear water as
minutes.
directed in steps d and e.
n. Stop the pump and disconnect the hoses and
v. Connect the pump and return to the purging
reconnect as instructed in steps d and e. Turn on the
manifold and the distilled water reservoir #4 (Top
water, (collect the first five gallons and dispose of in the
connection) and connect the pump input to the distilled
contaminated container) and allow to run for fifteen
water reservoir #4 output.
minutes.
w. Turn on the pump and allow to run for 30
o. Stop the pump, disconnect the hoses. Install a
minutes. Stop the pump and press the air release valve
clean #10 filter element in the filter housing.
p. Connect the pressure and return line to reservoir
to empty the tank (figure 7). Drain the tank.
x. Disconnect the pressure and return line from the
No. 3 (pyrosulphate solution).
q. Turn on the rectifier (figure 2) and adjust the
#4 reservoir and connect them respectively to Glycol
reservoir #5 input and drain connection. Start the pump
current for 640 mA on the AMPEREMETER.
and let it run for 30 minutes.
r. Start the pump.
y. Stop the pump, disconnect all external hoses
s. Check the concentration of copper ions in the
and reconnect all internal hoses to the respective
solution with Quantifix Test paper and color comparator
connections. Remove the coolant tank reservoir cover
chart at five minute intervals until the solution stabilizes.
and ensure that the reservoir is full.
NOTE
14. Cleaning Station Flowcharts.
If, after the first 5 minutes the
The following flowcharts (figures 12, 13) show the
concentration of copper is 400 ppm
sequential procedure for cleaning the HIPIR liquid
or  more,  immediately  renew  the
coolant system components using the AKI-83005B
pyrosulphate  solution  and  repeat
cleaning station.
steps (q) thru (u).