SB 740-91-01
Figure 3-1. GDU Functional Test Setup
3. Inspection Requirements.
The following mechanical-visual inspections are applicable to all Gun Direction Unit series systems, sets, units, and
assemblies and further define the coded inspection criteria given in appendix A.
(a)
Visual Inspection
(1)
All decals are in place and all nomenclature is legible.
(2)
All external connectors are securely mounted, free from
damage and missing pins, and have protective covers installed.
(3)
All connectors and receptacles are identified.
(4)
Verify all covers are tight and no screws or bolts are
stripped.
(5)
Verify pressure relief valves are spring loaded to the
closed position and do not appear damaged.
Change 1 B-130.17
|