TM 5-3610-254-14
This task covers:
a. Inspection
c. Installation
b. Removal
LOCATION
ITEM
ACTION
REMARKS
INSPECTION
1. Center of
Darkroom wall
a. Inspect for dents,
Shelter
deep scratches, cor-
rosion, and missing
hardware.
b. Inspect for separa-
Light leaks
tion from shelter
from editorial
walls, floor, and
room into dark-
ceiling.
room are not
acceptable.
c.
Inspect for a secure
mounting of framework
to shelter and of
sheet metal skins to
framework.
REMOVAL
2. Darkroom
Wall
NOTE
The following equipment items are attached directly to or in close proximity to the darkroom partition and must
be removed from the darkroom wall before the wall can be removed.
a. Curtain assembly
Remove per
b. Air diffuser
Remove per
assembly
c. Rigid conduit
Remove per
6-44
|