TM 5-3610-254-14
5-25. TELEPHONE BINDING POST ASSEMBLY MAINTENANCE INSTRUCTIONS
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (cont)
d. Interior binding
Install from inside
posts (2)
through insulating
washer (4), then
through shelter wall.
e. Exterior binding
Thread onto interior
Modify a new
posts (1)
post using insulating
interior post
washer (3) between
by cutting off
shelter wall and ex-
the threaded
terior binding post.
stud. Locate
center and
drill a No. 21
size hole 0.5
in. (1.27 cm)
deep. Tap hole
with 10-32
U.N.F. bottom
tap.
This task covers:
a. Inspection
b. Removal
c. Installation
LOCATION
ITEM
ACTION
REMARKS
NOTE
If level indicator gage (4) and/or bracket (1) need repair, refer to paragraph 4-39.
INSPECTION
1. Outer Road-
Level indicator
Check for damage,
side Wall
assembly
completeness, and
and Outer
security.
Rear Wall
5-54
|