|
|
TM 5-3610-254-14
This task covers:
a. Inspection
c. Repair
b. Removal
d. Installation
LOCATION
ITEM
ACTION
REMARKS
INSPECTION
1. Front
Air conditioner
Inspect for security of
Inspection pro-
Wall of
mounting.
cedures are
Shelter
identical for
both air condi-
tioners.
2. Air Condi-
a. Electrical power
a. Inspect for proper
tioner
cable
connection to wall
receptacle and to
air conditioner.
b. Inspect for breaks,
cracks, cuts, or age-
checks on the rubber
insulation.
c.
Inspect cable clamps
for security of
mounting and ensure
that clamps do not
pinch or chafe cable.
b. Controls
Inspect for proper
Refer to TM 5-
operation.
4120-239-14
(TRANE models)
or TM 5-4120-
340-14 (KECO
models) for
proper opera-
tion and test
procedures.
c. Air conditioner
Inspect missing rivets,
Ductwork
main body and
dents, breaks, corro-
exists on
ductwork
sion, and proper
curbside air
connection of adapter
conditioner
boot to airduct and to
only.
discharge grill of air
conditioner.
5-31
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |