Click here to make tpub.com your Home Page

Page Title: Table 5-1. DIRECT SUPPORT TROUBLESHOOTING (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-3610-254-14
Table 5-1. DIRECT SUPPORT TROUBLESHOOTING (cont)
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
WARNING
Death or serious injury could result if electrical precautions are not taken when maintaining this
equipment. Be sure that power cables are unplugged/disconnected, that circuit breakers are set to
OFF and that generator cables are unplugged/disconnected. Be sure the equipment is properly
grounded. Always have another person standing by who is familiar with electrical shock first aid.
a.
Connect the primary power cable to the input power receptacle located near the door of
the shelter.
b.
The cable connector and the receptacles are keyed to ensure proper connection. The
leads of the power cable are color coded as follows:
L1 - black - Pin 1
L2 - red - Pin 2
Ground - green - Pin 3 (marked with blue band)
LO - white - Pin 4
Step 4.
Inspect main power cable for continuity as follows:
a.
Disconnect power cable from shelter receptacle and generator.
b.
Using a suitable test meter, check for continuity across power cable leads.
If necessary, repair or replace defective power cable as described in paragraph 5-27.
Step 5.
Inspect main power receptacle for pin damage or faulty wiring as necessary.
If necessary, repair or replace main power receptacle as described in paragraph 5-28.
5-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business