Click here to make tpub.com your Home Page

Page Title: Section VI. PREPARATION FOR STORAGE OR SHIPMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-3610-254-14
4-47. WALL PARTITION MAINTENANCE INSTRUCTIONS (cont)
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (cont)
10. Curtain
a. Curtain (1), metal
Install.
(1)
strap (5), and
screws (4)
b. Holdback strap (2)
Install.
and screws (3)
c. Holdback strap (2)
Connect.
Section VI. PREPARATION FOR STORAGE OR SHIPMENT
4-48. PREPARATION FOR STORAGE OR SHIPMENT INSTRUCTIONS
EDITORIAL SHELTER
Specific shipment and limited storage instructions relative to the shelter in which equipment of the printing plant is
installed are found in TB 43-0124, Maintenance and Repair procedures for shelters.
SUPPLEMENTAL INSTRUCTIONS
In addition to following the instructions given in TB 43-0124 relative to shipment and limited storage, perform the
following operations: a. Drain the water from the water tank and water lines.
b. Remove the electrical cable from the shelter and the generator and store inside the shelter.
c. Store all minor components in the proper storage cabinet.
d. Be certain that loose equipment is fastened securely.
e. Thoroughly clean and inspect all items of equipment to be certain they are in serviceable condition. Correct
deficiencies or report them as stipulated in DA Pam 738-750.
f. Lubricate, inspect, and clean shelter.
4-117

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business