|
|
TM 5-3610-254-14
This task covers:
a. Inspection
c. Installation
b. Removal
LOCATION
ITEM
ACTION
REMARKS
INSPECTION
1. Shelter
Equipment receptacles
Check for loose connec-
Wall
tions and excessive
wear.
2. Equipment
Covers
Inspect for secure
Receptacles
mounting.
WARNING
Death or serious injury could result if electrical precautions are not taken when maintaining this
equipment. Be sure that circuit breakers are set to OFF. Be sure the equipment is properly
grounded. Always have another person standing by who is familiar with electrical shock first aid.
REMOVAL
3. Equipment
a. Screw (1)
Remove.
Receptacles
b. Cover (2)
Remove.
c. Screws (3)
Remove.
d. Receptacle (4)
Pull from conduit.
e. Wires (5)
Tag and disconnect.
f. Receptacle (4)
Remove.
4. Air
a. Screws (6)
Remove.
Conditioner
Receptacle
b. Cover (7)
Remove.
c. Screws (8)
Remove.
d. Receptacles (9)
Pull from conduit.
4-99
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |