Click here to make tpub.com your Home Page

Page Title: Table 3-2. Functional Test Procedures (Cont.)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

ARMY TM 3-6665-329-13&P
AIR FORCE TO 11H2-18-1
Table 3-2. Functional Test Procedures (Cont)
Test
No.
Test
Procedure
4
Remote Alarm
a.
Connect jumper wire between socket D and E
Signal
of connector.
CONNECTOR
b.
Disconnect multimeter positive (red) lead
from test set, test point A.
c.
Set multimeter to 10 volt dc scale.
d.
Connect multimeter positive (red) lead to
TEST SET test point B.
Power ON.
e.
f.
Read multimeter. If it reads between 4.5 and
6.5 volts, continue testing. If it does not,
refer to Troubleshooting paragraph 3-7.4.
Power OFF.
g.
Remove jumper wire and disconnect multimeter
h.
leads.
i.
Disconnect cable from input power connector.
If used, unplug power supply from ac power
j.
source, and set aside.
Change 2
3-18

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business