Click here to make tpub.com your Home Page

Page Title: TEST (CONT)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

2-238
TM 3-4230-209-30&P
2-53. LOW PRESSURE HEATING BOILER ASSEMBLY (CONT).
LOCATION/lTEM
ACTION
REMARKS
Low Pressure Heating
Boiler Assembly/
Pipe plug (12)
Wrap external threads of a 1/2-inch pipe plug (12) before screwing it into
Pipe elbow (13)
port (11.
Remove quick disconnect coupling half (10)
from 90 pipe elbow (13).
Continue filliing low pressure heating boiler
assembly (8) until water flows from 90 pipe
elbow (13).
Select a check valve (14) (with 1-inch pipe thread to 3/4-14 in NPT) from
Check valve (14)
the M5 test set. Remove the internal parts of the check valve (14) to make
a reducing bushing.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business