Click here to make tpub.com your Home Page

Page Title: TEST (CONT)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Low pressure heating boiler
Raise refractory end of low pressure heating boiler
assembly (8)
assembly (8) approximately four inches from the floor
using 2 x 4 inch blocks or other heavy blocking materi-
als. This will eliminate any air pockets in the boiler.
Water hose (9)
Connect water hose (9) to quick disconnect coupling
Quick disconnect coupling
half (10). Fill low pressure heating boiler (8) with water
half (10)
until water flows from port (11). Shut off water. Dis-
Port (11)
connect water hose (9) from quick disconnect cou-
pling half (10). Remove quick disconnect coupling
half (10).
2-237
TM 3-4230-209-30&

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business