Click here to make tpub.com your Home Page

Page Title: REASSEMBLY (CONT)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Position the bottom fire box gasket (3) with notched end facing upward
Boiler unit (6)
onto the boiler unit (6) and insert four machine screws (5) with internal
Internal tooth lock
tooth lock washers (7) through the boiler unit (6) and fire box gasket (3)
washers (7)
With two or more soldiers, lift the refractory box assembly (2) with gas-
Hexagon plain nuts (8)
kets, screws, and lining in place. Position it onto end of boiler unit (6) and
aline holes. Install remaining machine screws (5) through refractory box
assembly (2) and gaskets (3 and 4). Secure refractory box assembly (2) to
boiler unit (6) with remaining internal tooth lock washers (7) and hexagon
plain nuts (8). Check all the way around the edge of the refractory box
assembly (2) to make sure gaskets (3 and 4) are properly installed.
Tighten all machine screws (5) and hexagon plain nuts (8) equally.
TM 3-4230-209-30&P
2-231

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business