Click here to make tpub.com your Home Page

Page Title: REASSEMBLY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-4230-209-30&P
2-230
2-53. LOW PRESSURE HEATING BOILER ASSEMBLY (CONT).
REMARKS
ACTION
LOCATION/lTEM
Low Pressure Heating
Boiler Assembly/
Repair by replacing unserviceable components.
Side fire box gasket (3)
Fire box gasket (4)
Fabricate side fire box gasket (4) (fig D-4) as required.
Fabricate fire box gasket (3) (fig D-20) as required.
Low Pressure Heating
Boiler Assembly/
WARNING
When handling asbestos material, always wear an air
filtering respirator, gloves, and goggles. Wash face and
hands with soap and water before eating or smoking.
Asbestos can cause cancer if handled without protection.
Position new refractory lining (1) into refractory box assembly (2). Install
Refractory lining (1)
the top fire box gasket (3) with notched ends facing downward along the
Refractory box
top edge of refractory box assembly (2). Install two side fire box gaskets
assembly (2)
(4). Insert a couple machine screws (5) through refractory box assembly
Fire box gaskets (3)
(2) and through each of the gaskets (3 and 4) to hold them in place.
Side fire box gaskets (4)
Machine screws (5)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business