Click here to make tpub.com your Home Page

Page Title: REASSEMBLY (CONT)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Pipe elbow (14)
Wrap antiseizing tape around external
threads of the pipe elbow (14) located at
the bottom of the boiler assembly (1).
Nonmetallic grommet (15)
Insert nonmetallic grommet (15) into
Quick disconnect coupling
hole in the skid assembly (2). Screw
half (16)
quick disconnect coupling half (16) onto
pipe elbow (14) and tighten.
Thermostatic switch (17)
Wrap antiseizing tape around the external threads of thermostatic
Electrical splice (18)
switch (17) before installing into top of boiler assembly (1).
Install thermostatic switch (17) into top of boiler assembly (1) and tighten.
Cut and strip electrical wire from thermostatic switch (17). Connect wires
to the electrical wiring with two electrical splices (18). (See pages 2-154
and 2-155.)
2-163
TM 3-4230-209-30&P

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business