Click here to make tpub.com your Home Page

Page Title: Cable Assembly 5J2.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-1040-279-12&P
f. Cable Assembly 5J2.
REMOVAL
1. Remove equipment container (P. 4-68).
2. Loosen two screws (1) securing sides of cover assembly (2). Remove two screws (3), lockwashers
(4), and washers (5) securing top of cover assembly and open cover assembly.
3. Remove four screws (6), washers (7), and nuts (8) from cable assembly (9).
4. Remove eight screws (10) and washers (11) securing equipment container panel (12).
5. Remove eight wire leads of cable assembly (9) from terminal bracket assembly (13). See smoke
generator wiring (P. 4-34).
6. Remove electric cable assembly (9) from equipment container (14).
INSTALLATION
1. Install electric cable assembly (9) in equipment container (14).
2. Install wire leads to TB12, see smoke generator wiring (P. 4-34). Coat terminal board screw threads
with sealing compound before securing wire leads.
3. Position equipment container panel (12) and secure using eight screws (10), and washers (11).
4. Secure electric cable assembly (9) using four screws (6), washers (7) and nuts (8).
5. Slowly close cover assembly (2). Position hoses in equipment container while closing cover so that
hoses do not become kinked or pinched. Secure cover assembly with screws (1 and 3), lockwashers
(4), and washer (5).
6. Install equipment container (P. 4-68). Coat terminal board screw threads with sealing compound
before securing wire leads.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business