TM 11-6625-542-14-1
CHAPTER 7
GENERAL SUPPORT TESTING PROCEDURES
testing procedures given in this chapter are listed below.
7-1. General
a.  Electronic Voltmeter AN/USM-98.
a.  Testing procedures are prepared for use by
b.  Variable Transformer CN-16/A.
electronics field maintenance shops and electronic
c.  Oscilloscope AN/USM-281A.
service organizations responsible for general support of
d.  53-ohm termination connector.
electronic  repaired  equipment  to  determine  the
e.  Digital Readout Electronic Counter AN/USM-
acceptability of repaired equipment. These procedures
207.
set forth specific requirements that repaired equipment
must meet before it is returned to the using organization.
7-3. Modification Work Orders
These procedures may also be used as a guide for
The performance standards listed in the tests tables 7-1
testing equipment that has been repaired at general
through 7-7 are based on the assumption that all
support maintenance if the proper tools and test
modifications have been performed. A listing of current
equipments are available.
modification work orders will be found in DA Pam 310-7.
b.  Comply with the instructions preceding each
7-4. Physical Tests and Inspection
table. Perform each step in sequence. Do not vary the
a.  Test Equipment and Materials Required.
sequence.
For each step, perform each specific
None.
procedure and verify it against its performance standard.
b.  Test Connections and Conditions. None.
7-2. Test Equipment and Material Requirements
All the test equipment required to perform the
Table 7-1. Physical Tests and Inspection
Control Settings
Step No.
Test equipment
Equipment under test
Test procedure
Performance standard
a. Inspect case and chassis
a. There should be no
1
None .................
Any position ..............
for damage, missing parts
evidence of damage or
and condition of paint.
parts missing. External
painted surfaces should
not show bare metal.
Panel lettering will be
legible.
b. Inspect all controls and
b. Screws, bolts and nuts will
mechanical assemblies
be tight-none missing.
for missing screws, bolts
and nuts.
c. Inspect all connectors,
c. No loose parts or damage;
sockets, receptacles for
no missing parts.
looseness, damage, or
missing parts.
a. All pushbuttons should be
2
None .................
Any position ..............
a. Depress all front panel
push buttons.
capable of depressing and
releasing freely without
restriction.
b. Inspect all front panel
b. All jacks should be free of
jacks.
any obstruction that would
restrict the normal
insertion of the proper
plug.
the AN/USM-98 as indicated in TM 11-6625-438-15
7-5. Power Supply Voltage Measurements
prior to using.
a.  Test  Equipment  and  Materials  Required.
Electronic Voltmeter AN/USM-98.
b.
Test Connections and Conditions. Calibrate
7-1