|
|
DOZER PUMP:
REF.
REF.
NO.
DESCRIPTION
NO.
DESCRIPTION
1
Cover, Port End
8
Plug, Port
2
Seal, Ring
9
Cover, Shaft End
3
Bearing, Roller
10
Seal, Shaft Lip
4
Seal, Pocket
11
Gear, Driven
5
Plate, Thrust
12
Gear and Shaft, Drive
6
Seal, Gasket
13
Washer
7
Housing, Gear
14
Capscrew
1.
Place the pump in a vise with the drive
shaft pointing down. Do not grip on or near any
machined surfaces during disassembly or assembly.
Index mark all sections with a prick punch. Be sure to
align these marks when re- assembling.
2.
Remove the four cap screws (item 14) with
a socket wrench.
3.
Lift off the port end cover (item 1). If it is
necessary to pry it loose, be careful not to damage the
machined surfaces.
Pump Disassembly
Marking Sections
Port End Cover Removal
60-3.3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |