Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 3-1040-279-12&P
8.
Once the required temperature range is obtained, the testing of the M54 Smoke Generator can last
as long as required. Ensure that fuel supply will last during the testing period.
9.
Perform the normal M157 Smoke Generator System operating shut down procedures (P. 2-12),
close fluid valve (2) and turn off the water source.
10. Ensure M54 Smoke Generator engine head area is cool and disconnect the water manifold
assembly (1) from the fog oil tube assembly (8). Remove cap nut (5) from cover assembly fog Oil
tube nipple (7) and replace cap nut on water manifold assembly.
11. Reconnect fog oil tube assembly elbow (6) to the cover assembly fog oil tube nipple (7) and tighten.
12. At this time the other M54 Smoke Generator can be tested using the water manifold assembly, if
required. Repeat the above steps for installation and use.
13. Drain water from supply hose(s) and water manifold assembly. Store for future use as required.
4-185
Change 4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business