Table 2-1. Operator Preventive Maintenance Checks and Services (cont)
Not Fully
Procedure
Location
Item
Interval
Mission
Item to Check/
No.
Capable If:
Service
Indicators do not light.
b. Set circuit breaker CB 1
Control Panel
BEFORE,
8
and POWER switches (P.
Assembly
AFTER
(cont)
(cont)
indicator lights to test.
Replace indicator and
panel lights if required.
Notify organizational
maintenance if indicator or
panel lights do not light.
NOTE
If panel lights do not light,
check panel light control knob.
Ensure that both M54 Smoke
Generators are hooked
together electrically before
performing the following
check.
FIRE WARNING light does not
c. Place and hold FIRE TEST
BEFORE,
come on.
switch to TEST position.
AFTER
Check that the fire warning
light comes on within 2
seconds. Release switch
when light comes on or
after 2 seconds. Set circuit
breaker CB 1 and POWER
switch to OFF.
d. Monitor SMOKE TEMP
DURING
indicator for overheating.
e. Monitor indicators for
DURING
proper system operation.
Fuel
WARNING
9
Filter/Water
System contains combustible
Separator
fluids. Keep flames, sparks,
and ignition sources 100 feet
Assembly
away at all times. No smoking
within 100 feet. Have fire ex-
tinguisher available at all
times. Fires may result in per-
sonnel injury and loss of
equipment/system.
Change 4
2-10.3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |