|
|
TM 3-1040-276-23
CHAPTER 3
DIRECT SUPPORT MAINTENANCE INSTRUCTIONS
Section I. REPAIR PARTS; SPECIAL TOOLS; TEST, MEASUREMENT,
AND DIAGNOSTIC EQUIPMENT (TMDE); AND SUPPORT EQUIPMENT
3-2. SPECIAL TOOLS, TMDE, AND SUPPORT
3-1. COMMON TOOLS AND EQUIPMENT. For autho-
EQUIPMENT. Refer to Maintenance Allocation Chart
rized common tools and equipment, refer to the Modi-
fied Table of Organization and Equipment (MTOE)
assigned to your unit.
3-3. REPAIR PARTS. Repair parts are listed and illus-
trated in TM 3-1040-276-23P.
Section Il. DIRECT SUPPORT MAINTENANCE PROCEDURES
3-4. INTRODUCTION.
to 24 hours after operation. Use two peo-
ple at nozzle end, one on each side, to lift
a. This section contains maintenance procedures
and carry a hot smoke generator.
which are the responsibility of the direct support
maintenance technician as authorized by the mainte-
b. One quartermaster and chemical equipment
nance allocation chart (MAC) (app B) and source,
repairer (MOS 63J) can do most tasks alone. However,
maintenance, and recoverability (SMR) coded items in
it takes two people to lift and carry the smoke genera-
the repair parts and special tools list (RPSTL)
tor, engine assembly, or frame assembly. A welder is
(TM 3-1040-276-23P).
also needed, to weld the frame. No special environmen-
tal conditions are listed because none are required.
WARNING
Flames, hot gases, or hot fog oil may
shoot out from smoke outlet nozzles up
3-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |