|
|
TM 3-1040-276-23
Section V. ORGANIZATIONAL MAINTENANCE PROCEDURES
to 24 hours after operation. Use two peo-
2-6. INTRODUCTION.
ple at nozzle end, one on each side, to lift
a. This section contains maintenance procedures
and carry a hot smoke generator.
which are the responsibility of the organizational main-
tenance technician as authorized by the maintenance
b. Disassemble the smoke generator only as
allocation chart (MAC) (app B) and source, mainte-
needed for repair. One quartermaster and chemical
nance, and recoverability (SMR) coded items in the
equipment repairer MOS 63J can do each task. How-
repair parts and special tools list (RPSTL)
ever, it takes two people to lift and carry the smoke
(TM 3-1040-276-23P).
generator. No special environmental conditions are
listed because none are required.
WARNING
Flames, hot gases, or hot fog oil may
shoot out from smoke outlet nozzles up
2-7. SMOKE GENERATOR.
Change 1
2-13
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |