Click here to make tpub.com your Home Page

Page Title: Table 3-1. Organizational Preventive Maintenance Checks and Services
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-7010-207-23
Organizational Preventive Maintenance Checks and Services
Table 3-1.
Legend
S - Semiannual
M - Monthly
Interval
Equipment Will Be
Reported Not Ready/
Procedures
Item To Be
Item
Available If:
Inspected
S
M
No.
Self test fails
Run loopback self test.
Converter
1
Board
Clean and inspect converter
600GR
Z
2
assembly as follows:
Converter
Assembly
1. Make sure ac power is off.
2. Remove converter boards.
3. Clean case and converter
board(s) as follows:
CAUTION
Work carefully when cleaning
converter boards and inside
the case. Do not bump or
bend components. Do not
force wires aside. Clean
thoroughly but do not damage
components, wiring or brackets.
a. Put a soft brush type
nozzle on vacuum cleaner
hose.  Turn on vacuum cleaner.
b. Rub brush gently over
metal surfaces, wires and
components of converter boards.
c. Rub brush gently in all
parts of the converter
assembly case.
d. Use a small, soft, hand-
held brush to loosen dust and
debris around connector and
terminals.  Vacuum any dust
or debris that is not dis-
lodged by brush.
e. Wipe all external
surfaces of case with a clean
cloth dampened with window
cleaning solution.
3-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business