|
|
Control Settings
Step
Test Procedure
Performance Standard
Equipment under test
Test Equipment
No.
a. ACCEPT indicator lights.
Same as step 1 . . . . . . . . . . . . . . . .
a. Set AN/APM-270(V) CON-
Same as step 1 . . . . . . . . . . . . . . . . . .
SECUTIVE REPLIES switch to
56. ACCEPT indicator should
light when test set PUSH TO
TEST switch is depressed.
b. REJECT indicator lights.
b. Set AN/APM-270(V) CON-
SECUTIVE REPLIES switch to
55. REJECT indicator should
light when test set PUSH TO
TEST switch is depressed.
c. None.
c. Set test set DIR RAD switch to
DIR.
d. ACCEPT indicator lights.
d. Set AN/APM-270(V) CON-
SECUTIVE REPLIES switch to
16. ACCEPT indicator should
light when test set PUSH TO
TEST switch is depressed.
e. REJECT indicator lights.
e. Set AN/APM-270(V) CON-
SECUTIVE REPLIES switch to
15. REJECT indicator should
light when test set PUSH TO
TEST switch is depressed.
f. None.
f. Set AN/APM-270(V) CON-
SECUTIVE REPLIES switch to
16.
g. REJECT indicator should
g. Set AN/APM-270(V) REPLY
light.
MODULATION lX/2X switch
at 2X. REJECT indicator should
light when test set PUSH TO
TEST switch is depressed.
Return switch to lX.
a. None.
a. Connect
AN/UPM-137A
Same as step 1 . . . . . . . . . . . .....
Same as step 1 . . . . . . . . . . . . . . . . . .
oscilloscope VERTICAL-CHAN
A-VIDEO IN jack to
AN/UPM-137A rf signal
generator VIDEO OUT jack.
b. REJECT indicator lights.
b. A d j u s t AN/APM-270(V)
MODULATIONSPACING
PULSE 2 control ccw until delay
between leading edges of first
and second pulses displayed on
AN/UPM-137A oscilloscope
CHAN A is 1.45
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |