|
|
f. Set the RANGE switch to-10 DBM and
f. Meter deflects slightly
right
(ap-
to
readjust zero set course and fine con-
proximately -21
trols to zero meter. Reconnect the MX-
dbm).
2144A/U to the AN/APM-123 PROBE
connector. Observe the power meter
reading.
Remove the jumper from A4TP4 to
g.
ground.
5-5. Transmitter Output Pulse Test
a. Test Equipment Required
(1) Oscilloscope, AN/USM-281A.
(2) Test Facilities Set, Transponder Set AN/APM-270.
c. Procedure.
Control settings
Test
Equipment under
Performance
Step
test
Test equipment
procedure
standard
AN/USM-281A
a. Turn on the oscilloscope and test set.
a. None.
1
FUNCTION: SYSTEM.
POWER: ON
Pemit a few minutes warmup.
ISLS: ON.
b. None.
Sweep delay switch Delayed.
b. Press the test set PRESS-TO-TEST
POWER ON.
Delayed TIME/DIV: 5 sec
PRESS-TO-TEST: LOCK.
switch and turn to LOCK.
Main TIME/DIV: .5 sec
MODE: 1.
c. Adjust the oscilloscope as follows:
c. See (1) through (9)
Sweep Mode: AUTO
below.
Main SLOPE: -
( 1 ) Pulse widths:
(1) Adjust t h e H O R I Z O N T A L
0.8 0.1 s e c .
Delayed SLOPE: -
position control until the .50%
DIV DELAY: 02
point of the first pulse leading
Main Trigger Source switch: EXT
edge is positioned at the center
DISPLAY: A
graticule line. Measure the pulse
A VOLTS?DIV 5
width.
A POLARITY: UP
(2) Delay between
(2) Adjust the oscilloscope controls to
A Input coupling switch: AC
measure the delay between the
P1 and P2 shall
be 2 0.2 sec.
50% points of pulses Pl and P2.
(3) Adjust the oscilloscope control to
(3) Mode spacing:
3 0.2 sec.
measure the delay between pulses
Pl and P3 at the 50% points of
the leading edge.
d. Set the test set MODE switch at each of
d. None.
the positions, in (1) through (4) below
and repeat the procedure in c (3) above
to measure delays between P1 and P3.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |