CARD NO.
MAN
WORK
WORK UNIT
28 Day Inspection
INSPECTION
POWER
ON
IN
1-009
MIN
AREA
SYSTEM
SUB-SYS
REQUIREMENTS
E.
Clean all accessible interor areas with air compressor and a soft brush.
i
Make repairs to finish using the sandpaper and touch up paint only where
surface is readily accessible. Do not dismantle.
F.
Close rectifier 1PS1 cabinet door. On fuse panel 1A2 replace charge fuse
for rectifier 1PS1 and restore power to this rectifier by placing AC INPUT
circuit breaker in the ON position. Remove red tags.
0045
G.
Repeat the routine of steps C and D, (1) through (10) for rectifiers 1PS2
and 1PS3. Upon completion of this routine for each rectifier, perform step
E.
H.
List all defects found that could not be corrected by cleaning or tightening.
T.O. 31W2-4-203-6WC-1
T.M. 11-6130-363-14-1/2