Click here to make tpub.com your Home Page

Page Title: INSPECTION REQUIREMENTS-CONT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

ELECTRICAL
SERVICE
CARD NO.
MAN
WORK
WORK UNIT
28 Day Inspection
INSPECTION
POWER
ON
IN
1-007
MIN
AREA
SYSTEM
SUB-SYS
REQUIREMENTS
(1)
Dirt, rust and corrosion, all surfaces.  Clean with cloth moistened with
Perchloroethylene. If finish is damaged, sand lightly and touch up with
matching paint.
(2)
Loose hardware. Tighten.
(3)
Loose knobs. Tighten setscrews.
CAUTION
When cleaning front panel do not disturb the setting of the
screwdriver adjustments for POTENTIOMETERS R6, R7 and R8.
(Cont'd on next card)
T.O. 31W2-4-203-6WC-1
T.M. 11-6130-363-14-1/2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business