ELECTRICAL
SERVICE
CARD NO.
MAN
WORK
WORK UNIT
28 Day Inspection
INSPECTION
POWER
ON
IN
1-006
MIN
AREA
SYSTEM
SUB-SYS
REQUIREMENTS
A.
The following materials are required:
(1)
Cloths; clean, dry and lint free.
(2)
Air compressor.
(3)
Soft insulated brush.
(4)
Sandpaper, No. 0000 grit.
(5)
Touchup paint (color to match as required).
(6)
Perchloroethylene FS O-T-236.
(7)
Insulated screwdriver, 6 inch.
(Cont'd on next card)
T.O. 31W2-4-203-6WC-1
T.M. 11-6130-363-14-1/2
|