|
|
TM 11-5995-208-24&P-1
Section II SERVICE UPON RECEIPT
INITIAL INSPECTION
Never assume that newly received twin coaxial cable assemblies are all perfectly serviceable. Upon
receipt, carefully perform a visual inspection to make sure that all connectors are Properly capped,
and an ID tag is attached with the following information:
1. Nomenclature
2. Length
M a k e sure also that all reels are sound and can be used on the proper reel machine.
QUALITY CHECKS
Do all the PMCS items on pages 2-5 and 2-6.
Perform a dynamic test.
NOTE
Your organization should have a standard procedure for checking the quality of newly
received cables. This procedure should include a dynamic test with the cables connected
in a working PCM circuit with the MUX equipment.
Section Ill ORGANIZATIONAL PREVENTIVE MAINTENANCE
CHECKS AND SERVICES (PMCS)
To be sure that your cables will be able to support your mission, you must do scheduled preventive
maintenance checks and services.
Before cables are placed in storage, do all the PMCS items. This will help you keep your cables in top
shape.
After cables are removed from storage, and before releasing to a cable laying crew, do all the PMCS
items to make sure your cables are ready to go.
Monthly PMCS are important steps you should do on cables belonging to your unit and which are not
hooked up to an operating system. These steps should keep serious problems from suddenly
happening. If you waited to do PMCS on these cables just before your mission, you may find that you
do not have enough cables.
2-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |