Click here to make tpub.com your Home Page

Page Title: Section Ill OPERATION UNDER USUAL CONDITIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-5995-208-10
Section Ill OPERATION UNDER USUAL CONDITIONS
INSTALLATION INSTRUCTIONS
Twin coax cable assembly should be unreeled from a very slow moving truck,
but if the terrain or tactical situation will not permit moving the truck, then
you must unreel the cable by hand.
Twin coax cable assembly can be laid using the reeling machine or the
manual reeling machine.
Your cable route, testing procedures and safety information, including
minimum clearance, will be given to you by your team chief.
STARTING INSTRUCTIONS FOR LAYING TWIN COAX CABLE ASSEMBLY WITH
A VEHICLE
WARNING
Keep hands away from reels, dispenser, and cable during wire laying
or recovering operations from moving vehicles.
When using a vehicle for installation of twin coax cable assembly, make sure
you have set up a STOP, GO and SLOWDOWN set of signals between the crew
and the driver.
2-9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business